Rigorous delay analysis methodology
We reconstruct complex project timelines day-by-day using resource-loaded Primavera P6 schedules to isolate critical path shifts, proving exactly where delays occurred to withstand intense legal and technical audit.
Contractual scheduling standards
Every extension of time claim is structured under internationally recognized protocols to ensure immediate acceptance by legal counsels, developers, and global arbitration panels.
SCL Delay Protocol
AACE RP 29R-03
FIDIC Red Book
Applying the Society of Construction Law Second Edition guidelines to resolve complex concurrency disputes and prolongation cost claims.
Implementing rigorous forensic scheduling methodologies to deliver objective, evidence-based delay quantification that withstands technical scrutiny.
Structuring extension of time (EOT) claims precisely under 1999 and 2017 FIDIC contractual frameworks to protect against liquidated damages.
The reconstruction method
Baseline Validation
Impact Analysis
Critical Path Isolation
We verify the original resource-loaded Primavera P6 baseline schedule to establish a contractually sound and technically accurate starting point.
We model delay events chronologically using Time Impact Analysis (TIA) to isolate specific employer risk events from contractor-caused delays.
We track dynamic shifts in the critical path over time to accurately quantify prolongation costs and resolve concurrent delay liabilities.
Protect your project
Secure your contractual extension of time and mitigate multi-million SAR liquidated damages with forensic-grade scheduling evidence. Let us analyze your project timeline.